EZ Invert
If reducing labor and increasing productivity is your priority,
check out the EZ INVERT.
1. Place screw and channel plates in the EZ Invert Form.
2. Pour concrete into the form and vibrate to eliminate bubbles.
3. Lift and Strip form from concrete invert.
4. Insert adjustment bolts and adjust for the desired slope.
5. Lower the invert into the manhole base.
6. Line up the inlet and outlet holes and grout in the EZ Invert.
* The Bench as a drop of about 2 1/2".
1. Place screw and channel plates in the EZ Invert Form.
2. Pour concrete into the form and vibrate to eliminate bubbles.
3. Lift and Strip form from concrete invert.
4. Insert adjustment bolts and adjust for the desired slope.
5. Lower the invert into the manhole base.
6. Line up the inlet and outlet holes and grout in the EZ Invert.
* The Bench as a drop of about 2 1/2".